The installation of self contained emergency lights is a statutory requirement in most countries. They need to be provided at strategic places throughout the building in order to aid the evacuation of the building occupants out of the building in the event of failure o the mains supply.
The need for these emergency lighting is real even during daytime because some internal corridors inside the
Showing posts with label Main switchboard. Show all posts
Showing posts with label Main switchboard. Show all posts
Electrical MCCB installation
This section lays out the major performance requirements for the MCCB (moulded-case electrical circuit breakers) installation inside switchboards.All moulded-case circuit breakers shall comply with IEC 60947-2.All electrical MCCB shall be of moulded insulating material of good mechanical strength and non-tracking properties. The tripping mechanisms shall be calibrated in compliance with IEC
Labels:
Building electrical
,
Electrical MCCB
,
Main switchboard
,
MCCB
Electrical busbars
The electrical busbars inside the switchboards shall be of plain hard-drawn, high conductivity, electrolytic copper bars in accordance with BS EN 13601: 2002, and of adequate rectangular cross-section to carry continuously the specified current without overheating and shall be rigidly mounted on non-hygroscopic insulators so as to withstand any mechanical forces to which they may be subjected
Switchboard electrical earthing
Following is a picture showing the earthing busbar of a main switchboard. Below the picture is a simple performance specifications for the grounding of the switchboard.
The are also two more posts on switchboard installation check and switchboard electrical tests. The latter is a general list of tests and inspections that are usually required of a major switchboard such as main switchboards and
The are also two more posts on switchboard installation check and switchboard electrical tests. The latter is a general list of tests and inspections that are usually required of a major switchboard such as main switchboards and
Switchboard electrical tests
The following electrical tests must be carried to all switchboards, sub-switchboards, main distribution boards and motor starter panels.A. Full type tests1) Full type tests shall be carried out in accordance with IEC 60439-1, IEC 60947-1, and IEC 60947-6-1. Certificates issued by approved independent testing laboratories shall be submitted to the Employer’s Representative.The type tests shall
Labels:
Building electrical
,
checking
,
electrical tests
,
Main switchboard
,
switchboard installation
,
Testing
Electrical switchboard installation
The following is a sample perfomance specifications for the assembly and installation of switchboards in an electrical contract for a new multi-storey office building.ScopeThe scope of this section is to set down briefly the requirements, methods, materials, workmanship, standards and regulations in connection with the complete assembly of switches, starters, and/ or control devices as used in an